Mykori
“The project commences with site preparation and leveling through initial polish work to create ideal working surfaces. Core structure work follows, erecting load-bearing walls, columns, and beams to establish the building’s framework. With structural elements in place, precision door frame installations are completed to define openings before wall finishes. Tiling work then begins in wet areas and flooring surfaces, ensuring perfect alignment with structural elements. MEP systems are installed next, with coordinated electrical installation of conduits and wiring followed by plumber work for pipes and fixtures – both trades working sequentially to prevent conflicts. Finally, painting work transforms all surfaces with protective coatings and aesthetic finishes, applied after all rough construction to achieve flawless results.”